Midnight Mafia 2023

Midnight Mafia 2023

Midnight Mafia 2023

About this Project

For the second consecutive year, Tri-Point were pleased to work with Midnight Mafia 2023 in the Sydney Showgrounds Exhibition Halls.

Tri-Point worked with production to tweak rigging plots during in the lead-up. Then, for the show, Tri-Point provided all the top rigging and the production riggers to install the massive rig across the venue.

Tri-Point also supplied truss and scaffolding to Fulcrum Designs to suit the Main Stage.

Photo Credits: HSU – Harder Styles United

Ed Sheeran 2023

Ed Sheeran 2023

Ed Sheeran 2023

About this Project

Working with Frontier Touring, Tri-Point provided the local Head Rigger (Corey Harris) for Ed Sheeran’s custom stage build Sydney leg.

Additionally, Tri-Point’s David Hird, Kieren Dew, and team designed and installed a rigging system to cover 100 metres of Accor Stadium’s new super screen to suit the in-the-round concerts.

Photo Credits: Accor Stadium

Elton John 2023

Elton John 2023

Elton John 2023

About this Project

Working for Frontier Touring, Tri-Point provided production riggers at Allianz Stadium in January 2023 to suit Elton John’s “Farewell Yellow Brick Road” tour.

It’s been almost 6 years since we last had the pleasure of rigging for Sir Elton John, and we were honoured to be a small part of his final tour down under.

 

Photo Credits: Dicklyon – Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)

NYE in the Park 2022

NYE in the Park 2022

 NYE in the Park 2022

About this Project

Another year, another NYE in the Park at Victoria Park in Camperdown, Sydney.

Tri-Point has provided staging and production rigging for NYE in the Park every festive season since 2018, with the exception of 2020 when the event went on a 1 year hiatus due to the pandemic.

This year, the main stage featured:

  • Tri-Point’s 15m Bass Stage
  • Custom roof trim height
  • Custom roof grid to suit Flight Facilities’ Monolith video wall
  • Scaffold PA towers SL & SR
  • Custom artwork header valance.

Lead by Project Manager & Director, Dave Hird and Crew Boss, Mick Traynor, the team pulled together during an unprecedented busy period to get the job done.

Guns N’ Roses 2022

Guns N’ Roses 2022

Guns N’ Roses 2022

About this Project

We love production rigging season! And we love working at Accor Stadium (Stadium Australia).

Working on Guns N’ Roses on behalf of TEG Dainty, Tri-Point provided 20 x production riggers to install and remove the points on main stage, as well as riggers to install the stadium ring delays.

The Head Rigger on the crew was Robin Chelton.

Photo Credits: Accor Stadium