P!NK 2024

P!NK 2024

P!NK 2024

About this Project

For P!NK’s 2024 Summer Carnival Tour, Tri-Point provided riggers for production and the fly gag at Sydney Football Stadium (Allianz Stadium), Mcdonald Jones Stadium (Newcastle Stadium), and Stadium Australia (Accor Stadium) at Sydney Olympic Park.

To attach the fly gag, the riggers had to work from up on top of the roof at Sydney Football Stadium (Allianz Stadium) looking out over Moore Park, whilst they worked from the gantry at Stadium Australia (Accor Stadium).

The epic tour included 4 shows in New South Wales, between 3 venues. Tri-Point were proud to work on all of them. 

Photo Credits: Youtube

Taylor Swift 2024

Taylor Swift 2024

Taylor Swift 2024

About this Project

For the Sydney leg of the Taylor Swift 2024 Eras Tour, Tri-Point provided the local steel climbers for the custom StageCo stage build. Tri-Point provided a 12-man day crew and a 12-man night crew for the 36-hour condensed stage build at Accor Stadium, Homebush.

Tri-Point also provided riggers for the stadium ring delays, production, pyro and pixmob installs and bump outs. More than 30 x riggers were requested for the production install!

Four of the crew remained on standby throughout all four of the sold out shows, which managed to dodge a number of inclement weather systems just enough to allow the shows to go on!

Photo Credits: Accor Stadium

Midnight Mafia 2023

Midnight Mafia 2023

Midnight Mafia 2023

About this Project

For the second consecutive year, Tri-Point were pleased to work with Midnight Mafia 2023 in the Sydney Showgrounds Exhibition Halls.

Tri-Point worked with production to tweak rigging plots during in the lead-up. Then, for the show, Tri-Point provided all the top rigging and the production riggers to install the massive rig across the venue.

Tri-Point also supplied truss and scaffolding to Fulcrum Designs to suit the Main Stage.

Photo Credits: HSU – Harder Styles United

Ed Sheeran 2023

Ed Sheeran 2023

Ed Sheeran 2023

About this Project

Working with Frontier Touring, Tri-Point provided the local Head Rigger (Corey Harris) for Ed Sheeran’s custom stage build Sydney leg.

Additionally, Tri-Point’s David Hird, Kieren Dew, and team designed and installed a rigging system to cover 100 metres of Accor Stadium’s new super screen to suit the in-the-round concerts.

Photo Credits: Accor Stadium

Elton John 2023

Elton John 2023

Elton John 2023

About this Project

Working for Frontier Touring, Tri-Point provided production riggers at Allianz Stadium in January 2023 to suit Elton John’s “Farewell Yellow Brick Road” tour.

It’s been almost 6 years since we last had the pleasure of rigging for Sir Elton John, and we were honoured to be a small part of his final tour down under.

 

Photo Credits: Dicklyon – Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)