Limitless

Limitless

 Limitless

About this Project

In the National Geographic limited-series “Limitless with Chris Hemsworth,” the actor explores how to combat ageing and discover the full potential of the human body through a variety of extreme and unique challenges.

In episode 1, “Stress-Proof”, Hemsworth wants to learn how to deal with stress better. Psychologist Modupe Akinola challenges him to stay calm during a terrifying walk along a crane that’s projecting out from the roof of a skyscraper.

The skyscraper used for the challenge was Sydney’s Crown Towers at Barangaroo. The building stands at a height of 271.3 m (890 ft) across 75 floors, making it the tallest building in Sydney and the 4th tallest building in Australia!

Tri-Point Rigging Services were engaged to help safely create and set-up the stunt.

 

Tri-Point worked with Event Engineering and Richard “The Rope Guru” Delaney from RopeLab to design and manufacture custom steel components in order to attach a safety system to the Building Maintenance Unit (BMU).

We then created and installed two box truss “portals” to attach to the BMU in order to facilitate a safety system at both ends of “the walk” for Chris Hemsworth and all crew, as seen in the footage and screenshots below.

A test rig was conducted at Tri-Point’s yard in Botany before taking it to the Crown Towers.

Key challenges on this project included getting the equipment up to the roof in the first instance!

Definitely a fun one for the books..!

 

This That Festival 2022

This That Festival 2022

 This That Festival 2022

About this Project

After multiple heartbreaking postponements due to the pandemic, the annual This That Festival finally took place again in March 2022 at Wickham Park, Newcastle. Tri-Point were engaged once again to provide staging and production riggers to This That Festival on the Saturday, and Scene + Heard Festival on Sunday.

Main stage consisted of Tri-Point’s 15m Bass Stage with custom SL & SR wings to form house the video wall ‘T’s, along with a custom header.

NYE in the Park 2021

NYE in the Park 2021

 NYE in the Park 2021

About this Project

One of the first major events back in Sydney post-pandemic, NYE in the Park was back at the end of 2021 after a 1-year hiatus. Tri-Point were engaged to provide staging and production riggers at Victoria Park in Camperdown, Sydney.

The main stage featured:

  • Tri-Point’s 15m Bass Stage
  • Custom roof trim height
  • Scaffold PA towers SL & SR
  • Custom artwork header valance.

With a shorter-than-average build schedule, and multiple public holidays including New Years’ Day, Tri-Point remains proud to have been the main stage supplier to this festival since 2018.

Australian Open of Surfing

Australian Open of Surfing

 Australian Open of Surfing

About this Project

Tri-Point were asked to provide VIP decking, a concert stage, grandstands and bleacher-style seating for the inagural Australian Open of Surfing; a 9 day festival of skate, surf and youth culture, held at Manly Beach during February 2012 and attracting 170,000 visitors. Working in the sand, with limited hours of work due to residents close by, and load limits on deliveries due to the heritage listed promenade, all provided unique challenges for us to work with.

Tri-Point went on to provide the majority of temporary structures again in 2014, 2015, 2016 and 2017 inclusive, even providing the behemoth skate bowl scaffolding shell support in 2017 on top of the VIP decks, concert staging and variety of other platforms and seating solutions throughout the years.

We were very proud to be a part of such a large beach side event, and Tri-Point’s team, led by Director Dave Hird, has a lot of fun delivering it.